MATERIAL LIST

• Wood boards • Base molding • Cove moulding • Construction adhesive • Brad nails • Paintable caulk • Wood screws • Spackle

Remove the baseboard from the wall

1

attach another 1x3 and the base molding

3

Attach A third 1x3 to the middle of the wall

4

add the battens to the wall

5

add 1x2 to create a top ledge

6

fill nail holes, caulk, prime, and paint!

8